INSP - Final | 5/14/1996 | 5/14/1996 | 5/14/1996 | P | PASS |
Alan Hauser
|
|
|
05/14/96 350 - REINSPECTION FNL -OK FINAL combustion-air louvers installed and interlocked with boil
|
INSP - Final | 5/14/1996 | 5/14/1996 | 5/14/1996 | P | PASS |
Alan Hauser
|
|
|
05/14/96 350 - REINSPECTION FNL -OK FINAL combustion-air louvers installed and interlocked with boil
|
INSP - Final | 4/12/1996 | 4/12/1996 | 4/12/1996 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED STILL NEED LOWER COMBUSTION-A OPENING AS PER PLANS SHEET M2 KEY NOTE #19
|
INSP - Boilers | 3/28/1996 | 3/28/1996 | 3/28/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - PRESSURE TEST WAS WITNESSED BY GAS CO., BOILER NOT FINISHED YET WILL CHE THE AFTERNOON.
|
INSP - Boilers | 3/28/1996 | 3/28/1996 | 3/28/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - PRESSURE TEST WAS WITNESSED BY GAS CO., BOILER NOT FINISHED YET WILL CHE THE AFTERNOON.
|
INSP - Boilers | 3/27/1996 | 3/28/1996 | 3/28/1996 | A | CANC |
Dave Lightfoot
|
|
|
03/28/96 337 -
|