INSP - Final | 5/9/1996 | 5/10/1996 | 5/10/1996 | A | PASS |
Jim Sly
|
|
|
05/09/96 316 -
|
INSP - Final | 5/9/1996 | 5/10/1996 | 5/10/1996 | A | PASS |
Jim Sly
|
|
|
05/09/96 316 -
|
INSP - Framing/ Rough-in | 4/1/1996 | 4/1/1996 | 4/1/1996 | P | PASS |
Jim Sly
|
|
|
04/01/96 316 - THEY INSULATE THE DUCT WORK ON THE TRIM OUT. Other items on correction notice OK.
|
INSP - Rough-in & Gas Pressure | 3/27/1996 | 3/28/1996 | 3/28/1996 | A | FAIL |
Jim Sly
|
|
|
03/27/96 316 - Correction notice....Gas pressure test OK tag #029493
|