INSP - Final | 4/29/1996 | 4/29/1996 | 4/29/1996 | P | PASS |
|
|
|
04/29/96 326 - REINSPECTION Corrections made. Final ok.
|
INSP - Final | 4/29/1996 | 4/29/1996 | 4/29/1996 | P | PASS |
|
|
|
04/29/96 326 - REINSPECTION Corrections made. Final ok.
|
INSP - Final | 4/25/1996 | 4/26/1996 | 4/26/1996 | A | FAIL |
Alan Hauser
|
|
|
corrections
|
INSP - Final | 4/25/1996 | 4/26/1996 | 4/26/1996 | A | FAIL |
Alan Hauser
|
|
|
corrections
|
INSP - Gas pressure test | 4/16/1996 | 4/16/1996 | 4/16/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - GAS TEST OK, TAGGED PIPING
|
INSP - Rough-in & Gas Pressure | 3/28/1996 | 3/28/1996 | 3/28/1996 | P | PART |
Carl Dependahl
|
|
|
03/28/96 340 - CARL I THINK THIS IS THE ONE YOU HAVE ALREADY INSPECTED. gave verbal c/n to extend b-vent 6'' below gar lid
|