Permit Information
Permit NumberMEC96-00935
StatusExpired
Name WILLIAM LAMSON
Site Address 4306 W STATE ST
Project Name 
Customer Number 
ePlanReview 
Description
3-29-96 REMOVE EXISTING GAS PACS. INSTALL 9 NEW GAS PAC UNITS. NO STRUCTURAL PERMIT. INITIAL CERTIFICATE OF VALUE ON FILE. $36,052.00/DF
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/16/19967/16/19967/16/1996 PASS
DetailsAlan Hauser
/ / 350 - CORRECTIONS MADE FINAL
INSP - Final7/16/19967/16/19967/16/1996 PASS
DetailsAlan Hauser
/ / 350 - CORRECTIONS MADE FINAL
INSP - Final6/13/19966/14/19966/14/1996APASS
DetailsAlan Hauser
06/13/96 350 - PAGE LEWIS AT ###-#### AT THE SHOP THIS IS FOR AM PLEASE DO NOT FORGET TO HAVE LEWIS PAGED BEFORE YOU GO OU THERE HE WILL MEET YOU WENT BY GASLINE INSTALLED CORRECTLY NOW, WITNESSED 60# TEST ON LINE. JOB FINAL NOW
INSP - Final6/13/19966/14/19966/14/1996APASS
DetailsAlan Hauser
06/13/96 350 - PAGE LEWIS AT ###-#### AT THE SHOP THIS IS FOR AM PLEASE DO NOT FORGET TO HAVE LEWIS PAGED BEFORE YOU GO OU THERE HE WILL MEET YOU WENT BY GASLINE INSTALLED CORRECTLY NOW, WITNESSED 60# TEST ON LINE. JOB FINAL NOW
INSP - Final6/11/19966/12/19966/12/1996PFAIL
DetailsAlan Hauser
06/11/96 350 - PAGE LEWIS AT ###-#### one gas test for three units on east ok, the pressure test on gasline fo units to the west was ok, but looks like they are going to have their pr reducing regulators in the wrong spots. waiting on call from contracto
INSP - Final6/11/19966/12/19966/12/1996PFAIL
DetailsAlan Hauser
06/11/96 350 - PAGE LEWIS AT ###-#### one gas test for three units on east ok, the pressure test on gasline fo units to the west was ok, but looks like they are going to have their pr reducing regulators in the wrong spots. waiting on call from contracto
INSP - Final5/29/19965/29/19965/29/1996PFAIL
DetailsAlan Hauser
NO FINAL NEED TO EXTEND CONDENSATE DRAINS DOWN TO ROOF SURFACE, ALSO TO ASSISTANT MANAGER THAT GAS PIPING TO WHOLE SYSTEM IS UNDERSIZED. TALKED TO CONTRACTOR ABOUT CORRECTIONS 05/30/96, HE IS GOING TO HAVE GAS CO. START EQUIP. AND CHECK GAS PRESSURES.
INSP - Final5/29/19965/29/19965/29/1996PFAIL
DetailsAlan Hauser
NO FINAL NEED TO EXTEND CONDENSATE DRAINS DOWN TO ROOF SURFACE, ALSO TO ASSISTANT MANAGER THAT GAS PIPING TO WHOLE SYSTEM IS UNDERSIZED. TALKED TO CONTRACTOR ABOUT CORRECTIONS 05/30/96, HE IS GOING TO HAVE GAS CO. START EQUIP. AND CHECK GAS PRESSURES.
INSP - Final5/28/19965/28/19965/28/1996PNH
DetailsAlan Hauser
PLEASE CALL LUIS ###-####
INSP - Final5/28/19965/28/19965/28/1996PNH
DetailsAlan Hauser
PLEASE CALL LUIS ###-####