INSP - Final | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | PASS |
Alan Hauser
|
|
|
went over job with bob workman H.V.A.C. OK FINAL
|
INSP - Final | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | PASS |
Alan Hauser
|
|
|
went over job with bob workman H.V.A.C. OK FINAL
|
INSP - Framing/ Rough-in | 4/9/1996 | 4/9/1996 | 4/9/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK FOR SUITE 130, MEET WITH BOB WORKMAN FROM Y.M.C.
|
INSP - Framing/ Rough-in | 4/8/1996 | 4/8/1996 | 4/8/1996 | P | NR |
Alan Hauser
|
|
|
04/08/96 350 - INSTALL NEW VAV BOXES (2) AND ACCESSORIES YMC JOB #M-4797 WORKMAN PAGER ###-####-BLD96-0034-$39,900.00 1ST FLOOR REMODEL
|