INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Dave Lightfoot
|
|
|
06/21/96 337 - FNL -OK FINAL
|
INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Dave Lightfoot
|
|
|
06/21/96 337 - FNL -OK FINAL
|
INSP - Final | 5/10/1996 | 5/10/1996 | 5/10/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - WENT THROUGH WITH JIM STOREY SIGNED TEMP. OCCUPANCY CARD, ST MAINTAIN 1" AROUND B-VENT FROM W/H THROUGH ROOF.
|
INSP - Final | 5/10/1996 | 5/10/1996 | 5/10/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - WENT THROUGH WITH JIM STOREY SIGNED TEMP. OCCUPANCY CARD, ST MAINTAIN 1" AROUND B-VENT FROM W/H THROUGH ROOF.
|
INSP - Final | 5/9/1996 | 5/9/1996 | 5/9/1996 | P | CANC |
Dave Lightfoot
|
|
|
05/09/96 337 - R/I SCHEDULED TO ON THIS I WAS SICK AND GEORGE WAS CALLED TO HAVE ALAN DO INSPECTION
|
INSP - Final | 5/9/1996 | 5/9/1996 | 5/9/1996 | P | CANC |
Dave Lightfoot
|
|
|
05/09/96 337 - R/I SCHEDULED TO ON THIS I WAS SICK AND GEORGE WAS CALLED TO HAVE ALAN DO INSPECTION
|
INSP - Framing/ Rough-in | 5/9/1996 | 5/9/1996 | 5/9/1996 | P | PASS |
Dave Lightfoot
|
|
|
05/09/96 337 - REINSPECTION THEY ARE ALSO NEEDING A FINAL RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 4/24/1996 | 4/24/1996 | 4/24/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 4/23/1996 | 4/23/1996 | 4/23/1996 | P | PART |
Dave Lightfoot
|
|
|
04/23/96 337 - HOBSON JOB #2337-CONTACT: JOHN MCBRIDE-###-####-FLAT SCRE $820,195.00-BLD96-0011 I NEED TO REVIEW THE PLANS FOR RATED CORIDORS
|