INSP - Gas pressure test | 5/9/1996 | 5/10/1996 | 5/10/1996 | A | PASS |
Alan Hauser
|
|
|
05/09/96 350 - pressure test ok signed final occupancy card for y.m.c. a
|
INSP - Gas pressure test | 5/9/1996 | 5/9/1996 | 5/10/1996 | P | PASS |
Alan Hauser
|
|
|
05/09/96 350 - REINSPECTION FOR LATE PM TODAY gas test ok #29362,#29361
|
INSP - Gas pressure test | 4/23/1996 | 4/23/1996 | 4/23/1996 | P | FAIL |
Alan Hauser
|
|
|
04/23/96 350 - TWO ROOF TOP UNITS $2,000.00 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS PIPE UNDERSIZED FOR AMOUN EQUIPMENT ON ROOF, HAVE 1,172,000 B.T.U.S ON 1 1/2 " PIPE. TALKED TO CONTRACTOR AND THEY SAID THEY WOULD GET WITH DEBEST
|