INSP - Final | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PASS |
|
|
|
07/18/96 333 - reinspection FNL -OK FINAL
|
INSP - Final | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PASS |
|
|
|
07/18/96 333 - reinspection FNL -OK FINAL
|
INSP - Final | 7/16/1996 | 7/16/1996 | 7/16/1996 | P | FAIL |
Dave Lightfoot
|
|
|
07/16/96 337 - reispection STILL NEED EQUIP PROTECTION REINSPECTION FEE $ 42.00
|
INSP - Final | 7/16/1996 | 7/16/1996 | 7/16/1996 | P | FAIL |
Dave Lightfoot
|
|
|
07/16/96 337 - reispection STILL NEED EQUIP PROTECTION REINSPECTION FEE $ 42.00
|
INSP - Final | 7/12/1996 | 7/15/1996 | 7/15/1996 | A | FAIL |
Dave Lightfoot
|
|
|
07/15/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED EQUIP PROTECTION
|
INSP - Final | 7/12/1996 | 7/15/1996 | 7/15/1996 | A | FAIL |
Dave Lightfoot
|
|
|
07/15/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED EQUIP PROTECTION
|
INSP - Framing/ Rough-in | 6/11/1996 | 6/11/1996 | 6/11/1996 | P | PASS |
|
|
|
06/11/96 400 -
|
INSP - Framing/ Rough-in | 6/10/1996 | 6/10/1996 | 6/10/1996 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST OK
|
INSP - Rough-in & Gas Pressure | 6/7/1996 | 6/10/1996 | 6/7/1996 | A | |
|
|
|
BASIC FOUR.
|