INSP - Final | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - gas test ok meet contractor, furn. ok final
|
INSP - Final | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - gas test ok meet contractor, furn. ok final
|
INSP - Final | 6/18/1996 | 6/18/1996 | 6/19/1996 | P | PART |
Alan Hauser
|
|
|
06/18/96 350 - WENT BY LOOKED AT JOB EVERYTHING OK, STILL NEED TO GET ON CAROL FROM A-1 SET UP TIME TO MEET GAS PIPER AT 8:30 THURSDAY MORNING WI CHECK GAS PIPE AND FINAL JOB THEN
|
INSP - Final | 6/18/1996 | 6/18/1996 | 6/19/1996 | P | PART |
Alan Hauser
|
|
|
06/18/96 350 - WENT BY LOOKED AT JOB EVERYTHING OK, STILL NEED TO GET ON CAROL FROM A-1 SET UP TIME TO MEET GAS PIPER AT 8:30 THURSDAY MORNING WI CHECK GAS PIPE AND FINAL JOB THEN
|
INSP - Final | 6/14/1996 | 6/17/1996 | 6/17/1996 | P | NH |
Alan Hauser
|
|
|
06/17/96 350 - READY AT 3:00 MONDAY-INSTALL 2 GAS FURNACES IN BASEMENT A BLD96-1168-$14,850.00 closed on mondays try again tuesday afternoon after 2 p.m.
|
INSP - Final | 6/14/1996 | 6/17/1996 | 6/17/1996 | P | NH |
Alan Hauser
|
|
|
06/17/96 350 - READY AT 3:00 MONDAY-INSTALL 2 GAS FURNACES IN BASEMENT A BLD96-1168-$14,850.00 closed on mondays try again tuesday afternoon after 2 p.m.
|