INSP - Final | 9/10/1996 | 9/10/1996 | 9/11/1996 | P | PASS |
Alan Hauser
|
|
|
09/10/96 350 - final signed the occ. card at 516 s capitol
|
INSP - Final | 9/10/1996 | 9/10/1996 | 9/11/1996 | P | PASS |
Alan Hauser
|
|
|
09/10/96 350 - final signed the occ. card at 516 s capitol
|
INSP - Final | 8/29/1996 | 8/29/1996 | 8/29/1996 | P | FAIL |
Alan Hauser
|
|
|
08/29/96 350 - STILL HAVE CORRECTIONS, NEED UPPER COMB. AIR W/H ROOM AND DRAINS ON ROOF AND FLASH AROUND R.T.U.s
|
INSP - Final | 8/29/1996 | 8/29/1996 | 8/29/1996 | P | FAIL |
Alan Hauser
|
|
|
08/29/96 350 - STILL HAVE CORRECTIONS, NEED UPPER COMB. AIR W/H ROOM AND DRAINS ON ROOF AND FLASH AROUND R.T.U.s
|
INSP - Final | 8/28/1996 | 8/28/1996 | 8/28/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - SIGNED TEMP. CARD ALSO HAVE LETTER FROM ENG. THAT HE HAD LOO INSTALLATION OF SMOKE/FIRE DAMPERS AND APPROVED INSTALLATION
|
INSP - Final | 8/28/1996 | 8/28/1996 | 8/28/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - SIGNED TEMP. CARD ALSO HAVE LETTER FROM ENG. THAT HE HAD LOO INSTALLATION OF SMOKE/FIRE DAMPERS AND APPROVED INSTALLATION
|
INSP - Final | 8/20/1996 | 8/20/1996 | 8/20/1996 | P | FAIL |
Alan Hauser
|
|
|
08/20/96 350 - REINSPECTION- LOWER LEVEL STILL QUESTIONS ON FIRE/SMOKE DAMPERS AND FINISH W/H ROOM
|
INSP - Final | 8/20/1996 | 8/20/1996 | 8/20/1996 | P | FAIL |
Alan Hauser
|
|
|
08/20/96 350 - REINSPECTION- LOWER LEVEL STILL QUESTIONS ON FIRE/SMOKE DAMPERS AND FINISH W/H ROOM
|
INSP - Final | 8/13/1996 | 8/13/1996 | 8/14/1996 | P | FAIL |
Alan Hauser
|
|
|
08/13/96 350 - LOWER LEVEL no final not close to a final
|
INSP - Final | 8/13/1996 | 8/13/1996 | 8/14/1996 | P | FAIL |
Alan Hauser
|
|
|
08/13/96 350 - LOWER LEVEL no final not close to a final
|
INSP - Framing/ Rough-in | 6/27/1996 | 6/28/1996 | 6/28/1996 | P | PART |
Alan Hauser
|
|
|
06/28/96 350 - BLVD OFC BLDG-8 GAS PACK-ROOFTOP UNITS-EXHAUST FANS-GAS P WORK.BLD95-2149-FINAL CERT OF VALUE 48520.00. R/I OK FOR 1ST FLOOR WILL NEED ANOTHER INSPECTION FOR 2ND FLOOR LATER
|