INSP - Final | 11/4/1996 | 11/5/1996 | 11/5/1996 | A | PASS |
|
|
|
11/04/96 326 - Final ok.
|
INSP - Final | 11/4/1996 | 11/5/1996 | 11/5/1996 | A | PASS |
|
|
|
11/04/96 326 - Final ok.
|
INSP - Final | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | NR |
|
|
|
10/14/96 326 - Correction+ add protection post.
|
INSP - Final | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | NR |
|
|
|
10/14/96 326 - Correction+ add protection post.
|
INSP - Framing/ Rough-in | 8/19/1996 | 8/20/1996 | 8/20/1996 | A | PASS |
|
|
|
08/20/96 326 - EARLY AM PLEASE. Correction made. R/I ok.
|
INSP - Rough-in & Gas Pressure | 7/23/1996 | 7/24/1996 | 7/24/1996 | P | PART |
Alan Hauser
|
|
|
07/24/96 350 - BASIC 4 NO R/I P/T OK #28265
|