INSP - Gas pressure test | 11/8/1996 | 11/8/1996 | 11/8/1996 | P | CANC |
Dave Lightfoot
|
|
|
GAS PRESSURE TEST
|
INSP - Gas pressure test | 11/8/1996 | 11/8/1996 | 11/8/1996 | | FAIL |
Dave Lightfoot
|
|
|
11/08/96 337 - GAS PRESSURE TEST need to resize
|
INSP - Final | 8/30/1996 | 8/30/1996 | 8/30/1996 | P | PASS |
|
|
|
08/30/96 400 -
|
INSP - Final | 8/30/1996 | 8/30/1996 | 8/30/1996 | P | PASS |
|
|
|
08/30/96 400 -
|
INSP - Framing/ Rough-in | 8/2/1996 | 8/5/1996 | 8/5/1996 | A | PASS |
|
|
|
08/02/96 400 - REINSPECTION
|
INSP - Rough-in & Gas Pressure | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | FAIL |
|
|
|
07/25/96 333 - tag #028859 CORR-CORREC-CA
|