INSP - Final | 9/20/1996 | 9/20/1996 | 9/20/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Checked S. Younts corr. notice...OK Final 9/20/96.
|
INSP - Final | 9/20/1996 | 9/20/1996 | 9/20/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Checked S. Younts corr. notice...OK Final 9/20/96.
|
INSP - Final | 9/17/1996 | 9/17/1996 | 9/18/1996 | P | NR |
|
|
|
09/17/96 326 - Corrections: Vent WH, extend rigid gas pipe at WH, cook-t
|
INSP - Final | 9/17/1996 | 9/17/1996 | 9/18/1996 | P | NR |
|
|
|
09/17/96 326 - Corrections: Vent WH, extend rigid gas pipe at WH, cook-t
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | NR |
|
|
|
09/06/96 326 - Not ready. WH not set / vented. Asked YMC man to call for reinspection.
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | NR |
|
|
|
09/06/96 326 - Not ready. WH not set / vented. Asked YMC man to call for reinspection.
|
INSP - Framing/ Rough-in | 7/29/1996 | 7/30/1996 | 7/30/1996 | A | PASS |
|
|
|
07/30/96 326 - Corrections made. R/I ok.
|
INSP - Rough-in & Gas Pressure | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | FAIL |
Dave Lightfoot
|
|
|
07/25/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED USE R6 FLEX DUCT IN ATTIC SEAL ALL VENT SLEEVE SEAMS UPPER COMBUSTI
|