INSP - Final | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - corrections made final
|
INSP - Final | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - corrections made final
|
INSP - Final | 8/28/1996 | 8/29/1996 | 8/29/1996 | A | FAIL |
Alan Hauser
|
|
|
08/29/96 350 - NO FINAL CORRECTIONS SEAL EXHAUST DUCT INSIDE CABINET, IN AND SUPPORT GAS PIPE @ FURN. W/H
|
INSP - Final | 8/28/1996 | 8/29/1996 | 8/29/1996 | A | FAIL |
Alan Hauser
|
|
|
08/29/96 350 - NO FINAL CORRECTIONS SEAL EXHAUST DUCT INSIDE CABINET, IN AND SUPPORT GAS PIPE @ FURN. W/H
|
INSP - Framing/ Rough-in | 7/29/1996 | 7/30/1996 | 7/30/1996 | A | PASS |
|
|
|
07/30/96 326 - R/I corrections done - ok. (Gas Test done.)
|
INSP - Rough-in & Gas Pressure | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | PART |
Alan Hauser
|
|
|
07/26/96 350 - NO R/I P/T OK #28280
|