INSP - Gas pressure test | 8/8/1996 | 8/9/1996 | 8/9/1996 | A | CANC |
Alan Hauser
|
|
|
08/09/96 350 - REINSPECTION
|
INSP - Final | 8/8/1996 | 8/8/1996 | 8/8/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GASLINE FIXED SIGNED FINAL OCC. CARD
|
INSP - Final | 8/8/1996 | 8/8/1996 | 8/8/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GASLINE FIXED SIGNED FINAL OCC. CARD
|
INSP - Gas pressure test | 8/8/1996 | 8/8/1996 | 8/8/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - P/T OK #28281
|
INSP - Final | 8/6/1996 | 8/7/1996 | 8/8/1996 | P | PART |
Mike Jordan
|
|
|
08/07/96 50 - PREFERS 2:30 - 3 PM SIGNED TEMP. OCC. BUT HAVE TO CHANGE GASLINE THAT IS UNDERSIZED. HAVE 1,299,000 BTU AT 30' ON 11/4" PIPE
|
INSP - Final | 8/6/1996 | 8/7/1996 | 8/8/1996 | P | PART |
Mike Jordan
|
|
|
08/07/96 50 - PREFERS 2:30 - 3 PM SIGNED TEMP. OCC. BUT HAVE TO CHANGE GASLINE THAT IS UNDERSIZED. HAVE 1,299,000 BTU AT 30' ON 11/4" PIPE
|
INSP - Final | 8/7/1996 | 8/7/1996 | 8/7/1996 | | NR |
Alan Hauser
|
|
|
/ / 350 - NOT READY CHECK IN A.M.
|
INSP - Final | 8/7/1996 | 8/7/1996 | 8/7/1996 | | NR |
Alan Hauser
|
|
|
/ / 350 - NOT READY CHECK IN A.M.
|
INSP - Gas pressure test | 8/6/1996 | 8/6/1996 | 8/6/1996 | P | |
Wes Worcester
|
|
|
4PM IF POSSIBLE
|