INSP - Final | 5/23/1997 | 5/27/1997 | 5/27/1997 | A | PASS |
Alan Hauser
|
|
|
05/27/97 350 - final
|
INSP - Final | 5/23/1997 | 5/27/1997 | 5/27/1997 | A | PASS |
Alan Hauser
|
|
|
05/27/97 350 - final
|
INSP - Final | 1/31/1997 | 2/3/1997 | 2/3/1997 | A | FAIL |
Alan Hauser
|
|
|
02/03/97 350 - no final, corrections posted
|
INSP - Final | 1/31/1997 | 2/3/1997 | 2/3/1997 | A | FAIL |
Alan Hauser
|
|
|
02/03/97 350 - no final, corrections posted
|
INSP - Framing/ Rough-in | 8/12/1996 | 8/12/1996 | 8/12/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - R/I OK
|
INSP - Rough-in & Gas Pressure | 8/8/1996 | 8/9/1996 | 8/9/1996 | A | PART |
Alan Hauser
|
|
|
08/09/96 350 - LOT-2 BLK-1 P/T OK #28285 NO R/I
|
INSP - Rough-in & Gas Pressure | 7/31/1996 | 8/1/1996 | 8/8/1996 | A | CANC |
Marv Burrus
|
|
|
LOT-2 BLK-1 I SENT TO WRONG INSPECTO. AJB
|