INSP - Final | 9/24/1996 | 9/25/1996 | 9/25/1996 | P | FAIL |
Dave Lightfoot
|
|
|
09/25/96 337 - WOULD LIKE EARLY AS POSSIBLE PLEASE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS COCK WRONG SIDE OF REGULA
|
INSP - Final | 9/24/1996 | 9/25/1996 | 9/25/1996 | P | FAIL |
Dave Lightfoot
|
|
|
09/25/96 337 - WOULD LIKE EARLY AS POSSIBLE PLEASE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS COCK WRONG SIDE OF REGULA
|
INSP - Final | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | NR |
Dave Lightfoot
|
|
|
08/23/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NOT READY
|
INSP - Final | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | NR |
Dave Lightfoot
|
|
|
08/23/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NOT READY
|
INSP - Gas pressure test | 8/15/1996 | 8/16/1996 | 8/16/1996 | A | PART |
Dave Lightfoot
|
|
|
08/16/96 337 - AIRPORT-FURNISH AND INSTALL NEW ROOF TOP UNIT WITH NECESS CERT OF VALUE 11,951.00. GP -OK GAS PIPING RTU NOT COMPLETE
|