INSP - Final | 10/24/1996 | 10/24/1996 | 10/24/1996 | P | PASS |
Alan Hauser
|
|
|
10/24/96 350 - FINAL OK
|
INSP - Final | 10/24/1996 | 10/24/1996 | 10/24/1996 | P | PASS |
Alan Hauser
|
|
|
10/24/96 350 - FINAL OK
|
INSP - Final | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | CANC |
Alan Hauser
|
|
|
CANCEL AS PER JACK
|
INSP - Final | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | CANC |
Alan Hauser
|
|
|
CANCEL AS PER JACK
|
INSP - Rough-in & Gas Pressure | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - NO ADDRESS, APPROVED MECH. AS PLBG HAD BEEN DONE
|
INSP - Rough-in & Gas Pressure | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | FAIL |
Alan Hauser
|
|
|
09/04/96 350 - P/T OK NO R/I CORRECTIONS, ALSO PLBG HAD BEEN DONE WITHOU CORRECTION ABOUT ADDRESS TO BE POSTED BEFORE INSPECTIONS
|