INSP - Final | 9/10/1996 | 9/12/1996 | 9/12/1996 | P | PASS |
Alan Hauser
|
|
|
09/12/96 350 - REINSPECTION FINAL I THOUGHT I HAD ALREADY FINALED THIS AND SIGNED CARD
|
INSP - Final | 9/10/1996 | 9/12/1996 | 9/12/1996 | P | PASS |
Alan Hauser
|
|
|
09/12/96 350 - REINSPECTION FINAL I THOUGHT I HAD ALREADY FINALED THIS AND SIGNED CARD
|
INSP - Final | 9/4/1996 | 9/5/1996 | 9/5/1996 | A | NH |
Alan Hauser
|
|
|
09/05/96 350 - ADD 1 HEAT PUMP, DUCT AND REGISTERS-BLD96-0777-CONTACT RI ###-####-$7,430.00 4TH FLOOR CORRIDOR OFFICE WAS LOCKED UP LEFT NOTICE B FRONT DOOR
|
INSP - Final | 9/4/1996 | 9/5/1996 | 9/5/1996 | A | NH |
Alan Hauser
|
|
|
09/05/96 350 - ADD 1 HEAT PUMP, DUCT AND REGISTERS-BLD96-0777-CONTACT RI ###-####-$7,430.00 4TH FLOOR CORRIDOR OFFICE WAS LOCKED UP LEFT NOTICE B FRONT DOOR
|