INSP - Final | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
|
|
|
11/13/96 326 - Final ok.
|
INSP - Final | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
|
|
|
11/13/96 326 - Final ok.
|
INSP - Final | 11/12/1996 | 11/12/1996 | 11/12/1996 | P | |
Stan Johnson
|
|
|
|
INSP - Final | 11/12/1996 | 11/12/1996 | 11/12/1996 | P | |
Stan Johnson
|
|
|
|
INSP - Framing/ Rough-in | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
|
|
|
/ / 326 - R/I ok - comb. air ducts may be installed for Final. (Unfinished basement).
|
INSP - Rough-in & Gas Pressure | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | PART |
|
|
|
10/04/96 326 - Gas Test ok = Tag #32732. R/I not ready till PM.
|