INSP - Final | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | PASS |
Alan Hauser
|
|
|
10/14/96 350 - CORRECTIONS MADE FINAL
|
INSP - Final | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | PASS |
Alan Hauser
|
|
|
10/14/96 350 - CORRECTIONS MADE FINAL
|
INSP - Framing/ Rough-in | 10/11/1996 | 10/11/1996 | 10/11/1996 | P | FAIL |
Alan Hauser
|
|
|
10/11/96 350 - NO FINAL NEED TO SEAL AROUND UNIT HEATER VENT @ CEILING
|
INSP - Gas pressure test | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | CANC |
Alan Hauser
|
|
|
10/04/96 350 - PLEASE DO THIS ASAP WE MISSED THIS..DIX WILL NOT NEED THIS TEST AS A-1 PLBG. IS DOING MORE GAS PIPING AND NOW WI HAVE A TEST FOR THE WHOLE BUILDING
|
INSP - Retro Fit (check note) | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FURN W/H OK P/T BY GAS CO. FINAL
|