INSP - Final | 1/14/1997 | 1/15/1997 | 1/16/1997 | P | CANC |
Wes Worcester
|
|
|
mech contractor called to reschedule
|
INSP - Final | 1/14/1997 | 1/15/1997 | 1/16/1997 | P | CANC |
Wes Worcester
|
|
|
mech contractor called to reschedule
|
INSP - Gas pressure test | 1/14/1997 | 1/15/1997 | 1/15/1997 | P | CANC |
Wes Worcester
|
|
|
ran out of daylight and mech contractor called to reschedule
|
INSP - Rough-in & Gas Pressure | 10/11/1996 | 10/11/1996 | 10/17/1996 | P | FAIL |
Alan Hauser
|
|
|
contractor removed gage still need pressure test
|
INSP - Rough-in & Gas Pressure | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | CANC |
Alan Hauser
|
|
|
10/09/96 350 - TO BE DONE BY #342
|