INSP - Final | 12/24/1996 | 12/26/1996 | 12/26/1996 | A | CANC |
Dave Lightfoot
|
|
|
12/26/96 337 - this inspection to be done by 350
|
INSP - Final | 12/24/1996 | 12/26/1996 | 12/26/1996 | A | CANC |
Dave Lightfoot
|
|
|
12/26/96 337 - this inspection to be done by 350
|
INSP - Final | 12/26/1996 | 12/26/1996 | 12/26/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Final | 12/26/1996 | 12/26/1996 | 12/26/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Rough-in & Gas Pressure | 11/7/1996 | 11/8/1996 | 11/7/1996 | A | PASS |
|
|
|
11/07/96 326 - R/I and Gas Test ok. Gas Tag #32558.
|