INSP - Final | 12/19/1996 | 12/19/1996 | 12/19/1996 | P | PASS |
|
|
|
12/19/96 326 - Final ok.
|
INSP - Final | 12/19/1996 | 12/19/1996 | 12/19/1996 | P | PASS |
|
|
|
12/19/96 326 - Final ok.
|
INSP - Framing/ Rough-in | 11/19/1996 | 11/19/1996 | 11/19/1996 | P | PASS |
|
|
|
11/19/96 326 - reinspection lyle pearson Corrections made. R/I ok.
|
INSP - Framing/ Rough-in | 11/15/1996 | 11/15/1996 | 11/18/1996 | P | FAIL |
Alan Hauser
|
|
|
11/15/96 350 - NO R/I, HAVE ONLY INNER LINER OF FLEX PIPE AS DUCT IN JOI 1 DUCTING, CHANGE DUCT IN FRONT OFFICES FOR BETTER AIR FLOW.
|