INSP - Final | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | PASS |
Alan Hauser
|
|
|
04/25/97 350 - all the building final
|
INSP - Final | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | PASS |
Alan Hauser
|
|
|
04/25/97 350 - all the building final
|
INSP - Partial final | 4/8/1997 | 4/8/1997 | 4/8/1997 | P | PART |
Alan Hauser
|
|
|
04/08/97 350 - phase 2 final ì
|
INSP - Final | 4/3/1997 | 4/3/1997 | 4/3/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - couldn't find bldg. supt. or contractor on site, don't know
|
INSP - Final | 4/3/1997 | 4/3/1997 | 4/3/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - couldn't find bldg. supt. or contractor on site, don't know
|
INSP - Partial final | 4/2/1997 | 4/3/1997 | 4/3/1997 | A | CANC |
Dave Lightfoot
|
|
|
04/03/97 337 - PHASE 2 ONLY this inspection will be done by 350
|
INSP - Framing/ Rough-in | 3/21/1997 | 3/24/1997 | 3/24/1997 | A | PASS |
|
|
|
03/24/97 326 - Ductwork R/I ok.
|
INSP - Framing/ Rough-in | 3/21/1997 | 3/21/1997 | 3/20/1997 | P | CANC |
|
|
|
03/21/97 333 - PARTIAL ROUGH-IN IN THE HARD ROCK CEILING AREAS ONLY given to stew
|
INSP - Framing/ Rough-in | 3/18/1997 | 3/19/1997 | 3/19/1997 | A | NR |
Alan Hauser
|
|
|
03/19/97 350 - not finished and ready for r/i inspection, left notice in from t.m.l. on job
|