INSP - Final | 2/26/1997 | 2/26/1997 | 2/26/1997 | P | PASS |
|
|
|
02/26/97 326 - unit a 4-Plex. Final ok.
|
INSP - Final | 2/26/1997 | 2/26/1997 | 2/26/1997 | P | PASS |
|
|
|
02/26/97 326 - unit a 4-Plex. Final ok.
|
INSP - Rough-in & Gas Pressure | 12/2/1996 | 12/3/1996 | 12/2/1996 | A | PASS |
|
|
|
12/02/96 326 - Done 12-2-96 PM.
|
INSP - Rough-in & Gas Pressure | 12/2/1996 | 12/2/1996 | 12/2/1996 | | PASS |
|
|
|
/ / 326 - (4) Gas Tests, Tag #32408 thru #32411, ok. (4) R/I's ok.
|
INSP - Rough-in & Gas Pressure | 11/26/1996 | 11/27/1996 | 11/27/1996 | P | |
Alan Hauser
|
|
|
4-plex
|
INSP - Rough-in & Gas Pressure | 11/25/1996 | 11/26/1996 | 11/26/1996 | A | CANC |
|
|
|
11/26/96 338 - LEFT UNITS commercial mec is for mec insp only
|