INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - madee ok
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - madee ok
|
INSP - Final | 1/13/1997 | 1/14/1997 | 1/14/1997 | P | NR |
|
|
|
01/14/97 326 - Corrections: Expose / install key valve at Fireplace, install Range Hood.
|
INSP - Final | 1/13/1997 | 1/14/1997 | 1/14/1997 | P | NR |
|
|
|
01/14/97 326 - Corrections: Expose / install key valve at Fireplace, install Range Hood.
|
INSP - Rough-in & Gas Pressure | 11/27/1996 | 11/29/1996 | 11/29/1996 | A | PASS |
|
|
|
11/29/96 326 - R/I and Gas Test ok. Gas Tag #32599.
|
INSP - Rough-in & Gas Pressure | 11/26/1996 | 11/27/1996 | 11/27/1996 | P | CANC |
Alan Hauser
|
|
|
11/27/96 350 - to be done by #326 friday
|