INSP - Final | 3/3/1997 | 3/4/1997 | 3/4/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/04/97 337 - FNL -OK FINAL
|
INSP - Final | 3/3/1997 | 3/4/1997 | 3/4/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/04/97 337 - FNL -OK FINAL
|
INSP - Gas piping | 12/3/1996 | 12/3/1996 | 12/3/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|
INSP - Gas pressure test | 12/3/1996 | 12/3/1996 | 12/3/1996 | P | CANC |
Alan Hauser
|
|
|
12/03/96 350 - TO BE DONE BY #337
|
INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Wes Worcester
|
|
|
talked to Dave and mech contractor about unions in the attic. Dave was going to have them removed and recall
|
INSP - Gas piping | 12/2/1996 | 12/2/1996 | 12/2/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | CANC |
Wes Worcester
|
|
|
asked Dave to look at quick disconnects in attic space
|
INSP - Rough-in & Gas Pressure | 11/27/1996 | 11/29/1996 | 11/29/1996 | A | FAIL |
Wes Worcester
|
|
|
gas test failed, support horizontal runs, quick disconnect in attic, finish taping joints of range hood
|
INSP - Rough-in & Gas Pressure | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | CANC |
Alan Hauser
|
|
|
11/27/96 350 - to be done by #342
|