INSP - Final | 2/6/1997 | 2/6/1997 | 2/6/1997 | P | PASS |
Dave Lightfoot
|
|
|
02/06/97 337 - FNL -OK FINAL
|
INSP - Final | 2/6/1997 | 2/6/1997 | 2/6/1997 | P | PASS |
Dave Lightfoot
|
|
|
02/06/97 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 12/17/1996 | 12/17/1996 | 12/17/1996 | P | PASS |
Dave Lightfoot
|
|
|
12/17/96 337 - RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 12/12/1996 | 12/13/1996 | 12/13/1996 | A | PART |
Dave Lightfoot
|
|
|
12/13/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|