INSP - Final | 1/16/1997 | 1/17/1997 | 1/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
01/17/97 337 - FNL -OK FINAL
|
INSP - Final | 1/16/1997 | 1/17/1997 | 1/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
01/17/97 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 12/12/1996 | 12/13/1996 | 12/13/1996 | A | PASS |
Dave Lightfoot
|
|
|
12/13/96 337 - RGHN-OK ROUGH IN GP -OK GAS PIPING
|