INSP - Final | 8/22/1997 | 8/22/1997 | 8/22/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
INSP - Final | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | CANC |
Alan Hauser
|
|
|
08/22/97 350 - CALL JIM CAMPBELL ###-#### BEFORE GOING SO HE CAN MEET YO LETTER FOR YOU #337
|
INSP - Final | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | CANC |
Alan Hauser
|
|
|
08/22/97 350 - CALL JIM CAMPBELL ###-#### BEFORE GOING SO HE CAN MEET YO LETTER FOR YOU #337
|
INSP - Final | 12/9/1996 | 12/9/1996 | 12/10/1996 | P | PART |
Alan Hauser
|
|
|
12/09/96 350 - NO FINAL ONLY SIGNED TEMP. OCC. AS THERE ARE STILL QUESTI H.V.A.C. INSTALLATION
|
INSP - Final | 12/9/1996 | 12/9/1996 | 12/10/1996 | P | PART |
Alan Hauser
|
|
|
12/09/96 350 - NO FINAL ONLY SIGNED TEMP. OCC. AS THERE ARE STILL QUESTI H.V.A.C. INSTALLATION
|
INSP - Framing/ Rough-in | 12/9/1996 | 12/9/1996 | 12/10/1996 | P | PASS |
Alan Hauser
|
|
|
12/09/96 350 - DUCTWORK IN CEILING AREA..BLD96-0278 NEED TO INSULATE METAL PIPE IN ATTIC
|