INSP - Final | 12/23/1996 | 12/23/1996 | 12/23/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
INSP - Retro Fit (check note) | 12/20/1996 | 12/20/1996 | 12/20/1996 | P | CANC |
Dave Lightfoot
|
|
|
12/20/96 337 - furnace and pressure test will do next mon
|
INSP - Framing/ Rough-in | 12/12/1996 | 12/12/1996 | 12/12/1996 | | NR |
Dave Lightfoot
|
|
|
/ / 337 - gas test and furnace not ready
|
INSP - Gas piping | 12/11/1996 | 12/11/1996 | 12/11/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 12/11/1996 | 12/11/1996 | 12/11/1996 | P | CANC |
Dave Lightfoot
|
|
|
12/11/96 337 - will do 12/12/96 was not ready at 11;30
|
INSP - Water heater | 12/11/1996 | 12/11/1996 | 12/11/1996 | P | CANC |
Dave Lightfoot
|
|
|
12/11/96 337 - will do 12/12/96 was not ready at 11;30
|
INSP - Gas pressure test | 12/10/1996 | 12/10/1996 | 12/10/1996 | P | CANC |
Dave Lightfoot
|
|
|
12/10/96 337 - NO TIME TODAY WILL BE DONE 12/11/96
|