INSP - Final | 3/7/1997 | 3/10/1997 | 3/10/1997 | A | PASS |
Alan Hauser
|
|
|
03/10/97 350 - final
|
INSP - Final | 3/7/1997 | 3/10/1997 | 3/10/1997 | A | PASS |
Alan Hauser
|
|
|
03/10/97 350 - final
|
INSP - Conference | 2/7/1997 | 2/7/1997 | 2/7/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - stop by to see if they had exchanged r.t.u.s and also instal over dishwasher in back room. were in process of changing r.t.u.s
|
INSP - Final | 1/6/1997 | 1/7/1997 | 1/7/1997 | A | PART |
Alan Hauser
|
|
|
01/07/97 350 - signed temp., still need to change r.t.u.s and install di
|
INSP - Final | 1/6/1997 | 1/7/1997 | 1/7/1997 | A | PART |
Alan Hauser
|
|
|
01/07/97 350 - signed temp., still need to change r.t.u.s and install di
|
INSP - Final | 12/27/1996 | 12/27/1996 | 12/27/1996 | P | FAIL |
Alan Hauser
|
|
|
12/27/96 350 - NO FINAL, CORRECTIONS ON GASLINE AND H.V.A.C.
|
INSP - Final | 12/27/1996 | 12/27/1996 | 12/27/1996 | P | FAIL |
Alan Hauser
|
|
|
12/27/96 350 - NO FINAL, CORRECTIONS ON GASLINE AND H.V.A.C.
|
INSP - Framing/ Rough-in | 12/11/1996 | 12/11/1996 | 12/11/1996 | P | PART |
Alan Hauser
|
|
|
12/11/96 350 - R/I OK, DUCT THROUGH ROOF ONLY, CHECK ABOVE SUSPENDED CEI
|