INSP - Final | 12/17/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Alan Hauser
|
|
|
12/18/96 350 - 1ST FLOOR BACK OF BLDG final
|
INSP - Final | 12/17/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Alan Hauser
|
|
|
12/18/96 350 - 1ST FLOOR BACK OF BLDG final
|
INSP - Framing/ Rough-in | 12/17/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Alan Hauser
|
|
|
12/18/96 350 - 1ST FLOOR BACK OF BLDG r/i ok
|
INSP - Framing/ Rough-in | 12/11/1996 | 12/12/1996 | 12/12/1996 | A | FAIL |
Alan Hauser
|
|
|
12/12/96 350 - there are 4 floors here and many tenant spaces, couldn't better directions as to where work is located.
|