INSP - Final | 2/6/1997 | 2/6/1997 | 2/6/1997 | P | PASS |
Dave Lightfoot
|
|
|
02/06/97 337 - FNL -OK FINAL
|
INSP - Final | 2/6/1997 | 2/6/1997 | 2/6/1997 | P | PASS |
Dave Lightfoot
|
|
|
02/06/97 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 12/30/1996 | 12/31/1996 | 12/31/1996 | A | PASS |
Dave Lightfoot
|
|
|
12/31/96 337 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 12/26/1996 | 12/27/1996 | 12/27/1996 | A | FAIL |
Dave Lightfoot
|
|
|
12/27/96 337 - re-inspection rough-in CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 12/12/1996 | 12/12/1996 | 12/12/1996 | P | PART |
Dave Lightfoot
|
|
|
12/12/96 337 - GP -OK GAS PIPING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|