INSP - Final | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | PASS |
Dave Lightfoot
|
|
|
01/21/97 337 - FNL -OK FINAL
|
INSP - Final | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | PASS |
Dave Lightfoot
|
|
|
01/21/97 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 12/24/1996 | 12/24/1996 | 12/24/1996 | P | PART |
Dave Lightfoot
|
|
|
12/24/96 337 - GP -OK GAS PIPING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 12/23/1996 | 12/23/1996 | 12/23/1996 | P | CANC |
Dave Lightfoot
|
|
|
DIDN'T GET THE INSPECTION
|