INSP - Final | 2/11/1997 | 2/12/1997 | 2/12/1997 | A | PASS |
|
|
|
02/12/97 326 - KEY ABOVE DOOR Final ok.
|
INSP - Final | 2/11/1997 | 2/12/1997 | 2/12/1997 | A | PASS |
|
|
|
02/12/97 326 - KEY ABOVE DOOR Final ok.
|
INSP - Rough-in & Gas Pressure | 1/3/1997 | 1/6/1997 | 1/6/1997 | A | PART |
|
|
|
01/06/97 326 - Gas Test done 1-3-97. R/I corrections made. R/I ok.
|
INSP - Rough-in & Gas Pressure | 1/6/1997 | 1/6/1997 | 1/6/1997 | P | PASS |
|
|
|
01/06/97 326 - Done in AM after call from Contr.
|
INSP - Rough-in & Gas Pressure | 1/3/1997 | 1/3/1997 | 1/3/1997 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Fail...Need insulation on ducts.
|
INSP - Rough-in & Gas Pressure | 1/3/1997 | 1/3/1997 | 1/3/1997 | | PART |
|
|
|
/ / 326 - Gas Test ok - Tag #32491. R/I correctioin: insulate all duct attic including vertical duct in chase.
|