INSP - Final | 4/7/1997 | 4/8/1997 | 4/8/1997 | A | PASS |
Alan Hauser
|
|
|
04/08/97 350 - final
|
INSP - Final | 4/7/1997 | 4/8/1997 | 4/8/1997 | A | PASS |
Alan Hauser
|
|
|
04/08/97 350 - final
|
INSP - Gas pressure test | 4/4/1997 | 4/4/1997 | 4/4/1997 | P | PART |
Alan Hauser
|
|
|
04/04/97 350 - will check monday
|
INSP - Framing/ Rough-in | 2/13/1997 | 2/14/1997 | 2/14/1997 | A | NR |
Carl Dependahl
|
|
|
02/14/97 340 - REIN...SENT IN ERROR, GAVE TO 333, PER KIM
|
INSP - Rough-in & Gas Pressure | 1/22/1997 | 1/23/1997 | 1/23/1997 | A | FAIL |
Alan Hauser
|
|
|
01/23/97 350 - not ready, no pt test on gasline
|
INSP - Rough-in & Gas Pressure | 1/23/1997 | 1/23/1997 | 1/23/1997 | | PART |
Alan Hauser
|
|
|
/ / 350 - pt ok, furn has corrections that will be checked on final
|