INSP - Final | 2/28/1997 | 3/4/1997 | 3/4/1997 | A | PASS |
|
|
|
03/04/97 326 - Final ok.
|
INSP - Final | 2/28/1997 | 3/4/1997 | 3/4/1997 | A | PASS |
|
|
|
03/04/97 326 - Final ok.
|
INSP - Framing/ Rough-in | 2/3/1997 | 2/4/1997 | 2/4/1997 | A | PASS |
|
|
|
02/04/97 326 - Corrections made. R/I ok.
|
INSP - Rough-in & Gas Pressure | 1/31/1997 | 1/31/1997 | 1/31/1997 | P | PART |
Alan Hauser
|
|
|
01/31/97 350 - pt ok, no r/i, corrections posted
|