INSP - Final | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | PASS |
Alan Hauser
|
|
|
03/13/97 350 - final, couldn't find a card to sign
|
INSP - Final | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | PASS |
Alan Hauser
|
|
|
03/13/97 350 - final, couldn't find a card to sign
|
INSP - Final | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | FAIL |
Alan Hauser
|
|
|
03/11/97 350 - no final, gave two copies of corrections to store owner t contractor.
|
INSP - Final | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | FAIL |
Alan Hauser
|
|
|
03/11/97 350 - no final, gave two copies of corrections to store owner t contractor.
|
INSP - Framing/ Rough-in | 2/7/1997 | 2/7/1997 | 2/7/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - stopped to see if they had completed the inside hvac work in
|
INSP - Gas pressure test | 2/5/1997 | 2/5/1997 | 2/5/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 2/4/1997 | 2/5/1997 | 2/5/1997 | A | CANC |
Alan Hauser
|
|
|
02/05/97 350 - to be done by #337
|
INSP - Framing/ Rough-in | 2/3/1997 | 2/3/1997 | 2/3/1997 | P | PART |
Alan Hauser
|
|
|
02/03/97 350 - r/i for bathrooms ok, will do rest later
|