INSP - Final | 4/1/1997 | 4/1/1997 | 4/1/1997 | P | PASS |
Dave Lightfoot
|
|
|
04/01/97 337 - FNL -OK FINAL
|
INSP - Final | 4/1/1997 | 4/1/1997 | 4/1/1997 | P | PASS |
Dave Lightfoot
|
|
|
04/01/97 337 - FNL -OK FINAL
|
INSP - Gas pressure test | 2/4/1997 | 2/5/1997 | 2/5/1997 | A | PASS |
Dave Lightfoot
|
|
|
02/05/97 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 1/31/1997 | 2/3/1997 | 2/3/1997 | A | FAIL |
Dave Lightfoot
|
|
|
02/03/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED RFC -REINSPECTION FEE CHARGED
|
INSP - Rough-in & Gas Pressure | 1/30/1997 | 1/31/1997 | 1/31/1997 | A | PART |
Dave Lightfoot
|
|
|
01/31/97 337 - RGHN-OK ROUGH IN gas test fail
|