INSP - Final | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/17/97 337 - FNL -OK FINAL
|
INSP - Final | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/17/97 337 - FNL -OK FINAL
|
INSP - Gas pressure test | 2/13/1997 | 2/14/1997 | 2/14/1997 | A | PASS |
Dave Lightfoot
|
|
|
02/14/97 337 - GP -OK GAS PIPING
|
INSP - Rough-in & Gas Pressure | 2/13/1997 | 2/13/1997 | 2/13/1997 | P | PART |
Dave Lightfoot
|
|
|
02/13/97 337 - RGHN-OK ROUGH IN gas test not ready
|