INSP - Final | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/01/97 337 - FNL -OK FINAL sign perm occ card
|
INSP - Final | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PASS |
Dave Lightfoot
|
|
|
10/01/97 337 - FNL -OK FINAL sign perm occ card
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/20/1997 | | NR |
Dave Lightfoot
|
|
|
08/20/97 337 - Scheduled by Hello! on 08/19/97 at 11:26:09. need to add chiller to permit
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/20/1997 | | NR |
Dave Lightfoot
|
|
|
08/20/97 337 - Scheduled by Hello! on 08/19/97 at 11:26:09. need to add chiller to permit
|
INSP - Framing/ Rough-in | 2/24/1997 | 2/25/1997 | 2/25/1997 | A | PASS |
Alan Hauser
|
|
|
02/25/97 350 - INSTALL CHILLED WATER AND CONDENSOR WITH RELATED PUMPS. AT&T..BASEMENT ok as per plans and specs
|