INSP - Final | 10/5/1998 | 10/5/1998 | 10/5/1998 | P | PASS |
Dave Lightfoot
|
|
|
10/05/98 337 - area h,f,d msti basement tom ###-####pager FNL -OK FINAL sign occ card
|
INSP - Final | 10/5/1998 | 10/5/1998 | 10/5/1998 | P | PASS |
Dave Lightfoot
|
|
|
10/05/98 337 - area h,f,d msti basement tom ###-####pager FNL -OK FINAL sign occ card
|
INSP - Final | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PART |
Dave Lightfoot
|
|
|
07/21/98 337 - tom ###-#### partial final on sec.8 this is a r/i only for H F D AREAS
|
INSP - Final | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PART |
Dave Lightfoot
|
|
|
07/21/98 337 - tom ###-#### partial final on sec.8 this is a r/i only for H F D AREAS
|
INSP - Framing/ Rough-in | 6/2/1998 | 6/2/1998 | 6/2/1998 | P | FAIL |
Dave Lightfoot
|
|
|
06/02/98 337 - BASEMENT AREA H-TOM ###-#### BEEPER CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 2/18/1998 | 2/18/1998 | 2/18/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - partial final north 1/2 of 1st floor
|
INSP - Final | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | CANC |
Dave Lightfoot
|
|
|
02/17/98 337 - final on 1st floor north half-msti-###-####-bob-digital canceled till 2/18/98
|
INSP - Final | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | CANC |
Dave Lightfoot
|
|
|
02/17/98 337 - final on 1st floor north half-msti-###-####-bob-digital canceled till 2/18/98
|
INSP - Framing/ Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | P | PASS |
Dave Lightfoot
|
|
|
12/04/97 337 - 1ST FLOOR MISTI--NORTH HALF RGHN-OK ROUGH IN
|
INSP - Final | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | PART |
Alan Hauser
|
|
|
07/07/97 350 - final on the first floor south half signed temp. occ. card
|
INSP - Final | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | PART |
Alan Hauser
|
|
|
07/07/97 350 - final on the first floor south half signed temp. occ. card
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | CANC |
Alan Hauser
|
|
|
06/05/97 350 - S. HALF OF BASEMENT to be done by #337
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | CANC |
Alan Hauser
|
|
|
06/05/97 350 - S. HALF OF BASEMENT to be done by #337
|
INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - final basement FNL -OK FINAL
|
INSP - Framing/ Rough-in | 6/5/1997 | 6/5/1997 | 6/5/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - rough in south part of 1st floor RGHN-OK ROUGH IN FNL -OK FINAL
|
INSP - Framing/ Rough-in | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | CANC |
Alan Hauser
|
|
|
06/05/97 350 - R/I FOR S. SIDE OF 1ST FLOOR to be done by #337
|
INSP - Framing/ Rough-in | 4/23/1997 | 4/24/1997 | 4/24/1997 | A | PART |
Alan Hauser
|
|
|
04/24/97 350 - SOUTH HALF OF BASEMENT. r/i ok, still need reg. and grills
|
INSP - Framing/ Rough-in | 3/13/1997 | 3/13/1997 | 3/13/1997 | P | PASS |
Alan Hauser
|
|
|
03/13/97 350 - first floor in basement/primary air shaft/ inspection on air shaft bottom in basement, ok to cover shaft bottom
|