INSP - Final | 5/13/1997 | 5/13/1997 | 5/13/1997 | P | FAIL |
Russ Owen
|
|
|
|
INSP - Final | 5/13/1997 | 5/13/1997 | 5/13/1997 | P | FAIL |
Russ Owen
|
|
|
|
INSP - Framing/ Rough-in | 3/13/1997 | 3/13/1997 | 3/13/1997 | P | PASS |
Dave Lightfoot
|
|
|
03/13/97 337 - re-inspection RGHN-OK ROUGH IN ì
|
INSP - Rough-in & Gas Pressure | 3/11/1997 | 3/12/1997 | 3/12/1997 | A | PART |
Dave Lightfoot
|
|
|
03/12/97 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING
|