INSP - Final | 4/17/1997 | 4/17/1997 | 4/17/1997 | P | PASS |
Alan Hauser
|
|
|
04/17/97 350 - OPEN final
|
INSP - Final | 4/17/1997 | 4/17/1997 | 4/17/1997 | P | PASS |
Alan Hauser
|
|
|
04/17/97 350 - OPEN final
|
INSP - Framing/ Rough-in | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | PASS |
Alan Hauser
|
|
|
03/17/97 350 - this has already been done
|
INSP - Framing/ Rough-in | 3/14/1997 | 3/14/1997 | 3/14/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - r/i corrections made, r/i ok
|
INSP - Rough-in & Gas Pressure | 3/13/1997 | 3/13/1997 | 3/13/1997 | P | PART |
Alan Hauser
|
|
|
03/13/97 350 - pt ok, r/i failed, correction posted (two copies)
|