INSP - Final | 4/2/1997 | 4/2/1997 | 4/2/1997 | P | PASS |
|
|
|
04/02/97 326 - unit 240/ Final ok.
|
INSP - Final | 4/2/1997 | 4/2/1997 | 4/2/1997 | P | PASS |
|
|
|
04/02/97 326 - unit 240/ Final ok.
|
INSP - Framing/ Rough-in | 3/28/1997 | 3/31/1997 | 3/31/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/31/97 337 - EXECUTRAIN UNIT 240 RGHN-OK ROUGH IN
|