INSP - Final | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | CANC |
Jim Sly
|
|
|
07/02/97 316 - gave to Tom A.
|
INSP - Final | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | CANC |
Jim Sly
|
|
|
07/02/97 316 - gave to Tom A.
|
INSP - Final | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | NH |
Jim Sly
|
|
|
06/30/97 316 - No Access...
|
INSP - Final | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | NH |
Jim Sly
|
|
|
06/30/97 316 - No Access...
|
INSP - Final | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | FAIL |
Jim Sly
|
|
|
06/27/97 316 - No Access...left note...
|
INSP - Final | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | FAIL |
Jim Sly
|
|
|
06/27/97 316 - No Access...left note...
|
INSP - Final | 6/25/1997 | 6/25/1997 | 6/26/1997 | P | FAIL |
Alan Hauser
|
|
|
06/25/97 350 - no final, corrections posted (2)
|
INSP - Final | 6/25/1997 | 6/25/1997 | 6/26/1997 | P | FAIL |
Alan Hauser
|
|
|
06/25/97 350 - no final, corrections posted (2)
|
INSP - Final | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | CANC |
Dave Lightfoot
|
|
|
06/18/97 337 - to be done by 350
|
INSP - Final | 6/18/1997 | 6/18/1997 | 6/18/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - no final, corrections left with contractor (2)
|
INSP - Final | 6/18/1997 | 6/18/1997 | 6/18/1997 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - no final, corrections left with contractor (2)
|
INSP - Final | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | CANC |
Dave Lightfoot
|
|
|
06/18/97 337 - to be done by 350
|
INSP - Rough-in & Gas Pressure | 4/4/1997 | 4/4/1997 | 4/4/1997 | P | PASS |
Dave Lightfoot
|
|
|
04/04/97 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|