INSP - Final | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
Alan Hauser
|
|
|
07/25/97 350 - AFTER 9 wanted the final occ. card signed, so i signed it, final inspection done #337
|
INSP - Final | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
Alan Hauser
|
|
|
07/25/97 350 - AFTER 9 wanted the final occ. card signed, so i signed it, final inspection done #337
|
INSP - Framing/ Rough-in | 4/3/1997 | 4/3/1997 | 4/3/1997 | P | PASS |
Dave Lightfoot
|
|
|
04/03/97 337 - NORTHWEST SAFETY..ROOF-TOP UNIT AND GAS PIPING..READY 2:3 FNL -OK FINAL
|