INSP - Final | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | PASS |
Alan Hauser
|
|
|
06/26/97 350 - final
|
INSP - Final | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | PASS |
Alan Hauser
|
|
|
06/26/97 350 - final
|
INSP - Framing/ Rough-in | 4/17/1997 | 4/17/1997 | 4/17/1997 | P | PASS |
Alan Hauser
|
|
|
04/17/97 350 - REINSPECTION r/i ok, pt ok
|
INSP - Framing/ Rough-in | 4/15/1997 | 4/16/1997 | 4/16/1997 | P | FAIL |
Alan Hauser
|
|
|
04/16/97 350 - didn't do corrections from 4/14, $42 reinspection, called
|
INSP - Rough-in & Gas Pressure | 4/11/1997 | 4/14/1997 | 4/14/1997 | A | FAIL |
Alan Hauser
|
|
|
04/14/97 350 - no r/i corrections, pt failed
|